The first Cental Valley turnout for Diamond Valley is a # 8. This will be a curved one. I've made a template with centerline and glued with at few spots the tie base.

2543

Then I removed a few ties and replaced them with PC board ties following an article from Joe Fugate.

25442545

With throw bar I followed my old way, a tie as throw bar: I drilled a 0,5mm hole through the points and soldered a wire into it. This wire is soldered to the bottom of the PC board throw bar.

25462547

I connected the points with the stock rails with very thin wire left over from relays.

25482549

This is a first test with the module.

2550

But there was a problem. The attached guard rails give not the correct clearance:

2551

We will see and test this. I've started with the next turnout, a Proto87 ULTIMATE HO TURNOUT. At first I glued the ties:

2552

The work of the first evening: I glued with CA the tie plates and used the rail as template, guidance. The wire is soldered to the frog.

25832584 2585
258625872588
258925902591

And the next day, making the throw bar. I use a PC board tie and drill 0.5mm holes through point rails and PC board tie. A 0.5mm wire is soldered to the throw bar. I reinforced the throw bar with a small piece of brass sheet.

259225932594
259525972598

The points did not suit very well with the stockrails. So I had to sand the stock rails to get space.
25992601